← All guides

Free quote template for tradies (Excel and printable)

By , founder

Last updated · 6 min read

A good tradie quote shows who you are, what is and is not included, an itemised price with GST, the payment stages, an expiry date and a place for the client to accept. Download the free Excel template, which adds a pricing worksheet for your costs and margin, or print the blank version.

Free download - no email needed

Quote template for tradies

The Excel file has a Quote tab the client sees and a Pricing worksheet for you, each with a filled-in example, and works out line totals, GST, the total and the payment schedule. It opens in Excel, Google Sheets and Numbers. The printable version is a blank A4 quote.

A quote is the first piece of your paperwork a client reads closely, and once they accept it, it is the deal you are working to. This template covers everything a written quote should have, so you can fill it in and send it the same day you walk the job. If you want the method for working out the price first, start with how to quote a job as a tradie.

What's in the template

  • Quote tab: your details, the client, quote number and date, a valid-until date that fills itself in 30 days later, the scope, the itemised price, GST, the total, a payment schedule, terms and an acceptance block
  • Pricing worksheet: materials with a waste allowance, labour at your true hourly cost, subbies, hire and disposal, overhead, contingency and your margin, worked out by dividing, not adding
  • Example quote and Example pricing: a merbau deck priced the same way as in how to quote a carpentry job, so you can see every cell in use
  • How to use: the steps, the business.gov.au checklist and a note on residential contracts

What a quote should include, and where it goes

business.gov.au lists what a written quote should include. Here is that list, and where each item sits in the template.

What to includeWhere it goes in the template
Your business name, ABN and contact detailsFrom (you)
The customer's name and contact detailsFor (client)
A clear description of the workScope of work: included, not included, assumptions
Itemised and total costs, including GST if it appliesPrice: lines, subtotal, GST and total
Any variations and revisions discussedA price line each, or a note in the scope
Payment terms, such as the due date and late payment penaltiesPayment schedule and Terms
Your preferred payment methodTerms
Start and finish datesQuote details: proposed start and finish
A quote expiry dateQuote details: valid until
Space for the customer's signature and dateAcceptance

List from business.gov.au, checked 22 October 2026.

Filling it in, section by section

Scope of work

Write the scope in the client's words, not trade shorthand. Then fill in the two boxes most quotes skip. Not included is where you list what a client might assume is in: stairs, painting, council fees, making good after another trade. Assumptions is where you write what the price relies on: clear access, normal ground, the client supplying the tiles by a date. Both turn a later surprise into a priced variation instead of an argument.

Price lines

Split the price into lines the client can follow: by stage, by room, or by part of the job. Use quantity and unit price where it helps the client compare (metres of fence, number of points) and a single 'lot' where it does not. You do not have to show your margin or your hourly cost; the pricing worksheet keeps those for you.

GST

Set 'Registered for GST?' to Yes and the template adds 10% and shows it on its own line; set it to No and the GST line drops to nil. To check a figure by hand, use the GST quote calculator.

Payment schedule

Enter a deposit and the milestones as percentages and the template works out each amount from the total, and tells you if the stages do not add up to 100%. Deposit caps for home building work differ by state, and some are lower than you might expect. Progress claims and payment stages lists them, and when the stages fall due, the free progress claim template picks up where the quote leaves off.

Terms and acceptance

Say how many days the client has to pay each invoice and how to pay, and that changes to the scope are priced in writing before the work is done. The acceptance block gives the client a place to sign and date. business.gov.au says that if a customer accepts your quote, it becomes a legally binding contract, so read quote vs estimate if you are not sure which one you are giving.

An example quote

The Example quote tab is a merbau deck about 4.2 by 3.6 metres, priced at $14,000 ex GST on the Example pricing tab. On the quote the client sees four lines, not the cost build-up behind them.

LineAmount (ex GST)
Set-out, concrete footings and posts$3,200
Bearers and joists (subfloor frame)$3,900
Merbau decking supplied and fixed$6,300
Clean-up and rubbish removal$600

Example only. Your lines and prices come from your own pricing worksheet.

Totals and payment schedule

Subtotal ex GST
$14,000
GST at 10%
$1,400
Total inc GST
$15,400
Deposit on acceptance, 10%
$1,540
Frame complete, 40%
$6,160
Completion, 50%
$7,700

Stages add up to 100%: $15,400

Residential building work can need more than a quote. In NSW, for example, residential building work over $5,000 including GST needs a written contract, and other states set their own thresholds, contents and deposit caps. Check with your state's building or fair trading regulator before you start the job.

Before you send it

  1. Check the totals against your pricing worksheet, so the price you send is the price you worked out.
  2. Check your ABN, licence number and the client's details.
  3. Set the valid-until date. Thirty days is the template default; shorten it if your supplier prices move fast.
  4. Save it as a PDF and name it with the client and quote number.
  5. Send it the same day or the next, with a short note on when you could start.

Quotes without the spreadsheet

TrackYaTradie builds quotes from your own price list and job templates, sends them as a link the client can accept online, and then tracks hours and costs against the quoted price as the job runs. The template is yours to keep either way.

Questions

Is the quote template really free?+

Yes. Download it, change it, use it for as many quotes as you like. There is no email sign-up and nothing to install.

Can I add my logo?+

Yes. In Excel or Google Sheets, insert your logo as an image at the top of the Quote tab, then save a copy as your own blank template so it is there on every quote.

Do I need a contract as well as a quote?+

Sometimes. For residential building work, states set their own rules on when a written contract is needed and what it must contain. In NSW, for example, it is over $5,000 including GST. Check with your state's building or fair trading regulator for the work you do.

Should my quote show GST?+

If you are registered for GST, show it: the template adds 10% on its own line and shows the total. If you are not registered, set GST to No and do not charge it. [Do I need to put GST on a quote](/resources/do-i-need-to-put-gst-on-a-quote) explains when you have to register.

See your profit on every job, live

Set your job value once, log costs as you go, and watch your margin in real time. Built for Aussie trade businesses.

Start free trial

14-day free trial. No credit card required.